Transforming a landmark Leeds office building into a modern, sustainable workspace for the future.
Located in the heart of Leeds’ bustling business district, 9 East Parade is a prominent office building that has recently undergone a full-scale refurbishment. Our client sought to reposition the asset within the competitive commercial market, modernising both the interior and exterior spaces while preserving the building’s historic character.
The project, completed between March 2023 and June 2024, focused on delivering contemporary workspace solutions tailored to the needs of dynamic city-based businesses. Our team provided a comprehensive range of services including project management, design consultancy, structural reconfiguration, and fit-out works, with the overall programme delivered successfully within the agreed budget of £3.2 million.
Programme Date
March 2023 - June 2024
Sector
Commercial & Hospitality
Services Provided
Developer, Project & Cost management
Project Costs
£3.2 Million
Project
Brief
Our vision was to create a flexible, high-specification office environment that would appeal to both established companies and emerging tech firms. Key project goals included increasing natural light penetration, optimising the internal floorplate, and enhancing the building’s street presence with a revitalised reception and façade improvements.
Sustainability was a central focus throughout the brief. Targeting a BREEAM “Very Good” rating, the refurbishment incorporated energy-efficient systems, sustainable materials, and improved waste management processes to futureproof the property for years to come.
Development
Process
Following an initial feasibility assessment, we undertook a full measured survey and structural appraisal to inform the development strategy. The early stages involved careful stripping out of redundant M&E systems, followed by extensive internal reconfiguration to create open-plan floorplates and collaborative break-out zones. Key heritage features were sensitively restored to maintain the building’s character.
Throughout the programme, we worked closely with the client’s professional team and Leeds City Council to ensure all statutory approvals were secured on time. Collaborative working, proactive risk management, and robust supply chain coordination enabled us to deliver the scheme within 15 months, despite the challenges posed by operating in a live city-centre environment.
Post Completion
Review
Project Delivery and Outcomes
The refurbishment of 9 East Parade has been completed successfully, transforming the property into a best-in-class Grade A office space within the heart of Leeds. Over 15 months, approximately 48,000 square feet of internal space was stripped back and reimagined to meet the expectations of modern occupiers. Working closely with MadeUp Architects Ltd and contractor UrbanBuild Projects, the project team delivered the works on time and within the agreed £3.2 million budget. Sustainability and occupier wellbeing were key drivers throughout the scheme, resulting in a future-ready building that is now targeting a BREEAM Very Good rating.
The approach to project management was collaborative and proactive, with early engagement from the professional team ensuring risks were minimised and disruption to the surrounding area was carefully managed. Attention to both the heritage elements and the introduction of new infrastructure has positioned 9 East Parade as a leading office address in Leeds city centre.
Key Project Highlights:
- 48,000 sq ft of high-specification Grade A office space created
- Full strip-out and refurbishment delivered between March 2023 – June 2024
- Led by MadeUp Architects Ltd and UrbanBuild Projects
- Sustainability measures aligned to achieve BREEAM Very Good certification
- Project completed within the agreed £3.2 million budget
Building Features and Market Reception
Since the completion of works, 9 East Parade has seen strong interest from a wide range of prospective occupiers, underlining the project’s success in meeting market demands. The building now offers large, open-plan floorplates enhanced by exposed services design, a refurbished double-height reception, and significantly upgraded mechanical and electrical systems. Occupier experience has been prioritised with the addition of high-quality end-of-trip facilities including secure cycle storage, showers, and changing areas.
The refurbishment also achieved WiredScore Silver certification, demonstrating a commitment to providing exceptional digital infrastructure. Located just a short walk from Leeds train station, 9 East Parade combines premium design with outstanding connectivity, delivering a highly attractive proposition for businesses seeking flexible, sustainable, and futureproofed workspace in the city centre.
Enhanced Occupier Amenities:
- Revitalised reception and modernised façade treatments
- Exposed services design across flexible open-plan floorplates
- New high-efficiency HVAC and LED lighting systems
- Dedicated cycle storage, showers, and changing facilities
- WiredScore Silver certified for enhanced digital connectivity